|
Product Details:
Payment & Shipping Terms:
|
Machine Type: | Diesel Particulate Filters Cleaning Machine | Use: | Sterilizing / Disinfecting |
---|---|---|---|
Condition: | New | Cleaning Process: | Hot Water Cleaning,Solvent Cleaning |
Capacity: | 720L | Frequency: | 28khz/40khz/60khz/80khz/120khz |
High Light: | sonic wave ultrasonic cleaner,industrial cleaning machine |
Automatic Sonic Cleaning Machine Five Slot 720L Sterilizing Disinfecting Function
Automatic five-slot car bearing ultrasonic cleaning machine
A: Ultrasonic cleaning process for automotive axle industry:
Feeding--1 ultrasonic cleaning--2 ultrasonic rinsing--3 ultrasonic rinsing--4 wind cutting--5 hot air drying--cutting
Two: Installation instructions
The supplier will provide the foundation map and the water, electricity and compressed air interface diagrams for installation.
Industrial electricity: control cabinet top connector
Into the solution: the ball valve at the back of the device
Waste liquid discharge: waste liquid discharge pipe
When the equipment is delivered, provide a full set of technical information (1 set) for operation commissioning and maintenance, including operation and maintenance manual. The maintenance manual contains circuit diagrams, PLC and touch screen programs (electronic version), water piping diagrams, and lists control equipment, control components, consumables, and wearable parts names, models, and specifications so that users can repair and maintain them at any time. device.
Any update of these documents should be notified to the user immediately after publication.
When the equipment is delivered, some spare parts and wearing parts of the equipment are provided free of charge, including filter bags, electric heating tubes and fuses, which are installed in random.
After the equipment is assembled, it must be approved by the purchaser before shipping.
Three: equipment acceptance, pre-acceptance
General inspection: See if the physical layout of the equipment is reasonable. See if the appearance quality and basic functions of the equipment meet the technical requirements, and whether the pipeline connection of the equipment is strong.
Check the “three leaks” (leakage, oil leakage, air leak) phenomenon of the equipment.
Safety inspection includes: inspection of various protection functions such as mechanical and electrical fault display, detection, and alarm.
Equipment empty running check: No failure during the 8 hours of dry running.
Only after the pre-acceptance work is completed and the two parties agree, the supplier can package the equipment for shipment.
Four: final acceptance
Final acceptance is carried out in the workshop of the demand side. After the equipment arrives at the demanding workshop, the supplier must send a professional to the demand side for commissioning and complete the final acceptance work.
Contact Person: Mr. Liu
Tel: 13380162399
Fax: 86-769-88000540