|
Product Details:
Payment & Shipping Terms:
|
Product: | Aluminium Anodizing Machine | Water Supply Pressure: | 0.2-0.3Mpa |
---|---|---|---|
Standards: | GB 21900-2008 | Model: | HS-4700YH |
Frequency: | 50HZ | Relative Humidity: | ≤90% |
High Light: | aluminium anodising plant,automatic anodizing plant |
2 T/㎡ Automatic Anodizing Plant , Titanium Anodizing Machine Drainage Facilities Divided
First, the production line name: semi-automatic anodizing production line.
Second, the production line model: CCS-2100YH.
Third, the production line basic facilities requirements:
1. Production line foundation and plant conditions:
1.1 The function slot of the production line shall be load-resistant according to the standard factory floor, and the bearing capacity shall be ≥ 2 tons/M2.
1.2 The accessory equipment is installed in a separate area from the production line.
1.3 The place where the production line is placed shall be treated with anti-corrosion treatment according to the standard (PP board).
2. Water supply and drainage system:
2.1 The water supply and pure water supply source interface is connected by the user to the corresponding workshop of the production line to facilitate the supplier to install the production line.
2.2 Water supply pressure: 0.2-0.3Mpa;
2.3 The drainage facilities will be divided into degreasing wastewater, comprehensive wastewater and dye wastewater. The supplier shall be responsible for the sub-pipes to be connected to the designated collection place of the user (within 10 meters outside the equipment), and enter the user's sewage treatment station to discharge the standard.
2.4 The production line water (dispensing and cleaning water) is carried out according to the process requirements and actual conditions.
2.5 Production line drainage shall be carried out in accordance with the requirements of “Electroplating Pollutant Emission Standards” GB 21900-2008.
3, the exhaust system:
The production line needs to be ventilated to have a suction box or an air hood. The supplier is responsible for the sub-line to be connected to the exhaust gas treatment tower for treatment (within 10 meters outside the production line), and discharge after reaching the standard.
4. Power supply system:
4.1 Production line supply voltage: AC380V, 50HZ, three-phase five-wire system.
4.2 The user needs to direct the power supply to the corresponding production workshop of the production line to facilitate the supplier to install the production line.
5. Gas supply system:
5.1 Production line air supply pressure: 0.3-0.8Mpa;
5.2 The user needs to bring the gas source to the corresponding workshop of the production line to facilitate the supplier to install the production line.
6, production line working conditions:
6.1 Use environment: indoor, 5 ° C ~ 40 ° C;
6.2 Relative humidity: ≤90%;
Contact Person: Mr. Liu
Tel: 13380162399
Fax: 86-769-88000540